Here is my progress on my 05 SJ for this weekend....:woot:
Removed all the mats/contact cement.
Removed rubber rail caps/ super glue by sanding.
Marked and cut out for the WCF foot holds. Filed the hole, so they fit snug and perfect. The right side scared me with the exhuast like that...( a very close fit, and this is my first time installing holds)
Thats all I have for now, my time is limited.
Next weekend I will glue/rivit them, than I am on hold until Christmas when I will than get my foam, and biaxial.
I went with black molded diamond for the turf.:biggthumpup:
Removed all the mats/contact cement.
Removed rubber rail caps/ super glue by sanding.
Marked and cut out for the WCF foot holds. Filed the hole, so they fit snug and perfect. The right side scared me with the exhuast like that...( a very close fit, and this is my first time installing holds)
Thats all I have for now, my time is limited.
Next weekend I will glue/rivit them, than I am on hold until Christmas when I will than get my foam, and biaxial.
I went with black molded diamond for the turf.:biggthumpup: