DR3
Xscream Braaaap
- Location
- palm harbor, Fl
well as some as you know i have been out for about a year... last dec found out i had a little one on the way and just bought a house so i ended up selling everything to make things go my way.
this is now going to be my 2nd rebuild on my 2007 wdk xjet the right way...
this is not going to be a b!tching thread just a nice documentation on what i had to do to get it the way it should had been done the FIRST time
i originally had an exhaust failure last year mid-year and ended up cutting out the foothold and defoaming and repaired, refoamed, returfed and went with side exhaust (on a 6month old hull) ..
see here--http://www.x-h2o.com/threads/24027
NOTE!! the side exhaust was a horrible idea!! with it being midway like it was when i would side mount on the exhaust side it would do nothing but cavitate the pump (and never stopped blowin crap in you face)
so i ran that till dec and then parted everything out as you guys know....
anyway the ski has been sitting for about 11months now and i have been real slow so i finally got the itch to do what needed to be done. the problem was that wonderful motor bed wdk makes that has the firewall attach all in one and runs the whole length of the hull and basically make it a 2 piece design.. as far as wdk states it is suppost to be "sealed" and "one with the bottom deck" and also suppost to have all stainless hardware (which i asked b4 i ordered the hull). well i had notice water being held under the motor mounts and when would tip my ski up in the back it actually had water run out the front up by the nose:rant: he also foams under the mounts which is kinda out there imo bc foam holds water as well.. so basically i had a brand new ski that i just paid big $ for that needed a completely new bed plate.. the ski sat for so long bc i knew what i had to do and it was going to suck big time..
so i got started on it last week and so far heres the progress:
spent about 2 days cutting out the bedplate and grinding and prepping the bottom to start the reinforcement and repair of the delaminating bottom...
ill let the pictures speak for themselves
this is now going to be my 2nd rebuild on my 2007 wdk xjet the right way...
this is not going to be a b!tching thread just a nice documentation on what i had to do to get it the way it should had been done the FIRST time
i originally had an exhaust failure last year mid-year and ended up cutting out the foothold and defoaming and repaired, refoamed, returfed and went with side exhaust (on a 6month old hull) ..
see here--http://www.x-h2o.com/threads/24027
NOTE!! the side exhaust was a horrible idea!! with it being midway like it was when i would side mount on the exhaust side it would do nothing but cavitate the pump (and never stopped blowin crap in you face)
so i ran that till dec and then parted everything out as you guys know....
anyway the ski has been sitting for about 11months now and i have been real slow so i finally got the itch to do what needed to be done. the problem was that wonderful motor bed wdk makes that has the firewall attach all in one and runs the whole length of the hull and basically make it a 2 piece design.. as far as wdk states it is suppost to be "sealed" and "one with the bottom deck" and also suppost to have all stainless hardware (which i asked b4 i ordered the hull). well i had notice water being held under the motor mounts and when would tip my ski up in the back it actually had water run out the front up by the nose:rant: he also foams under the mounts which is kinda out there imo bc foam holds water as well.. so basically i had a brand new ski that i just paid big $ for that needed a completely new bed plate.. the ski sat for so long bc i knew what i had to do and it was going to suck big time..
so i got started on it last week and so far heres the progress:
spent about 2 days cutting out the bedplate and grinding and prepping the bottom to start the reinforcement and repair of the delaminating bottom...
ill let the pictures speak for themselves
Attachments
Last edited: