- Location
- Granbury, TX
So far I have mounted the handlepole and run cables. Test fit my new pipe and figured out mounting for it. Pump/impeller/rideplate/grate installed. Carb rebuilt and rejetted, new motor mounts installed.
Left to do:
-Turf
-Drop in motor and plumb lines.
-wire bilges/install bilge fittings
-cut up and turf chinpad
-other misc crap I can't think of
Travis' ski is almost done, all he has left is to finish turfing.
Left to do:
-Turf
-Drop in motor and plumb lines.
-wire bilges/install bilge fittings
-cut up and turf chinpad
-other misc crap I can't think of
Travis' ski is almost done, all he has left is to finish turfing.