Pump stuffer shim and Steering cable are in route!! Bars are G2G
Got the Battery cables all to the correct length, tray is screwed down and the start stop finished up last night.
Tonight Water Box Mod, Beer, and Dual cooling to be done posibly eliminate some slop in the steering stem.