- Location
- Ormond Beach Fl.
Almost ready for bonding, been working on this Tom 21 hull for a year now, had to set and realign mid shaft assembly and move pump mounts back to use a SJ driveshaft. These things came raw, but light! Added carbon in all know FX1 weak areas, under pivot, hood latch areas, bottom, and after bonding will carbon sides and entire bond line inside and out.
Used a mock pump with couch shaft to get alignment through firewall/midshaft/CF alignment tool and to mock cases and bed plate to line all 3 up properly. Getting close now, I can almost see light at the end of the (pump) tunnel !
Used a mock pump with couch shaft to get alignment through firewall/midshaft/CF alignment tool and to mock cases and bed plate to line all 3 up properly. Getting close now, I can almost see light at the end of the (pump) tunnel !