Custom/Hybrid 4-Tec Jetmate.

beerdart

4-Tec Jetmate
Location
CT
After a long winter nap its time to finish this project. Last step before paint is to remove the wet foam from the right sidewall I removed aprox 80 lbs then added a false floor to allow drainage and re-foamed. Today ill reglass the panel then get the top-deck ready for paint then its game on..

20140527_182921_zpslmaer2xo.jpg


20140530_175216_zpsizq9nyys.jpg


20140530_182143_zpsno9qse8s.jpg


20140530_182152_zpsjxcnkdaw.jpg


20140530_192427_zpskrs37idz.jpg
 
Top Bottom