- Location
- Forsyth County, GA
Going to be starting my footholds soon, and trying to think what the best way to do my turf is. I know a lot of people seem to use one piece for the rail/hold. I thought i remember seeing a how to on using one piece of turf for the hold/rail. Does anyone have a link to this, the wamiltons one in Tech didnt work?
How do most of yall do it, one piece for the side rail and the top of the hold then a piece to line the inside, or is using one piece and heating molding fairly easy? With turf being so expensive i'd like to do the easiest way possible, but would love to not have seams to maintain or see.
How do most of yall do it, one piece for the side rail and the top of the hold then a piece to line the inside, or is using one piece and heating molding fairly easy? With turf being so expensive i'd like to do the easiest way possible, but would love to not have seams to maintain or see.