- Location
- Kent, England, United Kingdom
Hey guys, I've taken the incentive to attempt my foothold and matkit lol. I've removed mats and adhesive and installed footholds which went rather well. Putting the 2part foam in and that t went everywhere. I'm at a dilemma now because I'm halfway up the footholds with the foam and the last batch I mixed I feel was incorrect as its not completely cured, it's not terrible but little sticky, the first lot that went in was good. Now do I just fill the rest up making sure the foams good as it will be waterproof around foot holds or is it such a balls up that I will have to take rivets, epoxy, holds and foam out and start again?