feartheride
feartheride
- Location
- St.Catharines,On.Canada
The exhaust bolts down through 2 of the front head bolts.. The manual unless I'm mis reading says to tourque down all 10 of 12 headbolts leaving the 2 front ones out till the exaust goes on..I would normally just torque all at once when the exhaust goes on..But since I want to do a leak test on bench,what do I do,just put 10 bolts in leaving out the front 2 or do all 12 and take the front 2 out to put the exhaust on..it's a 3 part metal gasket and I don't want to ruin it..
Any thoughts
thanks
Any thoughts
thanks