- Location
- Ontario, Canada
Beating a dead rotten horse here... But the Riva instructions are different from what many people discuss here. Setup for single cooling
From Riva instruction printout 1995:
1) pump -> mani
2) rear head -> top of chamber
3) Front head (1/8" line) -> capped
4) bottom of chamber -> stinger
There is no mention of restrictions or bypass to pissers. Based on the half dozen threads I've rifled through the above seems correct with the following exceptions:
3) front head (1/8" line) -> pisser
4) bottom of chamber -> stinger & pisser with a 2mm restrictor in the line going to the stinger.
Can someone chime in and confirm? is the restrictor to stinger necessary or can I just run 3/8 line everywhere? Hoping to nail this install first go!
From Riva instruction printout 1995:
1) pump -> mani
2) rear head -> top of chamber
3) Front head (1/8" line) -> capped
4) bottom of chamber -> stinger
There is no mention of restrictions or bypass to pissers. Based on the half dozen threads I've rifled through the above seems correct with the following exceptions:
3) front head (1/8" line) -> pisser
4) bottom of chamber -> stinger & pisser with a 2mm restrictor in the line going to the stinger.
Can someone chime in and confirm? is the restrictor to stinger necessary or can I just run 3/8 line everywhere? Hoping to nail this install first go!