Superjet new paintjob complete time lapse

Location
Ohio
Man that was cool and I don't remember that ever being done here before!

I played em' all at 2 speed and 1080!

Thanks I bet that was a lot of work besides the obvious work!
 

Jr.

Standing Tall
Staff member
Site Supporter
Location
Hot-Lanta
Very Nice work! I know all to well what you put into it and appreciate all your efforts! Hope you Enjoy it!

P
 

Myself

manic mechanic
Location
Twin Lakes AR
Thanks a lot guys. Between the hull fixing (busted nose and cracked straight down under the waterbox) and bond line reinforcing, and the reshaping of the front nose, and finally paint......I have roughly 200-250 hours in it. The ported and tunneled 650 is already done, and I think I have most everything else to put it back together. I figure on another 50 hours or so before it's water ready.
 
Location
Alabama
Thanks a lot guys. Between the hull fixing (busted nose and cracked straight down under the waterbox) and bond line reinforcing, and the reshaping of the front nose, and finally paint......I have roughly 200-250 hours in it. The ported and tunneled 650 is already done, and I think I have most everything else to put it back together. I figure on another 50 hours or so before it's water ready.
Looks good but I want to see it with the hood and handlepole on the hull.
 
Top Bottom