Finally got round to working on my alloy pole, hears the work so far, its for my sx 650
Just before the work started

3.jpg


First off stripped the the old pole off , OH MY POOR SKI

skiinbits.jpg


Bottom of the pole jigged up with light gauge s/s , to check tolerances , when in alloy it will be all smoothed off.

basetemp.jpg


Top part and steering jigged up

toptemp.jpg


Steering all welded up with stiffeners fitted

topjogged.jpg


Basics of the pole , the alloy tubes will be cut before fitting so as to get a -2" pole

polesjigged.jpg


Original pole chin pad cut down and re-trimmed ready

padcut.jpg



Just waiting now to get the final parts cut so I can make the pole base and weld it all together, then off to get the pole powder coated.

One thing when I removed the original pole, there is a pipe that appears to come from the fuel tank that goes in to a plastic container up by the bars, can I remove this pipe ? or whats the best thing to do with it,
 
Last edited:
Location
hhh
take a pic so im sure what you talking about. is it a piece of fuel line that goes into the bilge and hooks to the separator? if so just take it off the separator and leave the end open.
 

Shifty

- SuperJet Thursday -
I just put together a 650sx, and removed that water seperator and the line that runs up the handlepole. You can just leave the little plastic check valve with a short length of hose in the engine compartment.