Things were very different in 1880.

CRJ

Hibernating
Location
Toronto
I think the only thing more off topic would be desert related. I bought this place on April 8th, 2016. Since then, we have been working on it over the weekends and slowly making it fit my height (I'm 6'9", seriously!) and our style. I have a scattered collection of pictures that I would like to have somewhere to scroll through in coming years, and what better place than the X. Our place is a 1750 sqft yellow brick built in 1880. Before us, it was owned by a couple who bought it at 25 yrs old, and lived there until they went to a nursing home at 85. As I am 25 now, it seems fitting.

Home inspection went well, with a few concerns like a chimney that needed to be taken down, a bathroom that was aweful, and lots of crap patch work by the previous owner (I can only assume). They liked to cover things up rather than fix the damage/issues. In multiple rooms we have 3/8" drywall, nailed up, with 1/8" paneling over it. Like, why?

The house has a decently new roof, mid 90's vinyl windows (i think), and a new forced air furnace.

Anyways, heres the place. House_Picture.jpg


First order of business was to replace the short inset tub/shower combo with a clawfoot and walk in shower.

Old bathroom coming out:
oldbathroomout.jpg


New wall going up.
newwall.jpg

Roxul insulation throughout (Sound barried roxul behind shower not shown)
insulation.jpg

Tiling the shower
showertileandfloor.jpg

Grouted
showerbeforesealing.jpg

Sealing:
showertaped.jpg

And sealed
shower sealed.jpg
 

Attachments

  • chimneycomingdown.jpg
    chimneycomingdown.jpg
    165.5 KB · Views: 48

CRJ

Hibernating
Location
Toronto
While the weather was nice, we moved to the outside. re-pointing the bricks and foundation, removing the chimney and taking down the radio tower. I have a radio tower video I'll post, it was interesting. We used a long rope over the house to my truck to lower it, but it went a touch sideways. No, it wont make the carnage thread.

Anyways, the chimney. We saved about 150 bricks. Yes, those are bath towels over our 2nd floor windows. We found out they stained the house red back in the 50's, which is why the grout is a bit red and theres a big stripe up the house. It'll get scrubbed off in the spring.
chimneycomingdown.jpg

Shower glass was next.
showergettingglass.jpg


then the old tub gut.
guttingoldshower.jpg

and the new tub test fit (a bit of a jump ahead)
Tub_test_fit.jpg


Since then, we have grouted the floor, been sanding lots of drywall as my mudding skills arent ace just yet, and we re-finished our pantry, just finishing the drywall hanging. This room had no ceiling, no insulation and random barn boards for wall coverings. Like scrap pieces, not nice barn board. Full gut.
Panty_Drywall_Finished.jpg



Also forgot that like day 2 of ownership we ran plumbing for the laundry that never existed.
CuttingFloor.jpg
FloorPlumbing.jpg


Its coming along, and cleaned up nice this past spring.
Before on showing:
BackOfHouse.jpg

After a clean up and warm weather.
Back of house cleaned.jpg


I'll add more as I find them, and as we work. its a slow process as were saving most $ and working on it when we have some free time.
 

CRJ

Hibernating
Location
Toronto
Out of order, heres a few shots I've found.

This closet was taken out to fit the bathroom.
20160501_150940.jpg

And on the other side of the wall, the tiny bathroom before. The naked cherubs really sold us on this place. I should add that there was no heat to this bathroom or the bedroom behind it. As in, its never had heat. That has been resolved when we put in the jack studs, we ran a 4" solid line off the furnace.
20160501_150956.jpg
20160501_151006.jpg

A random demo shot from the bathroom wall removal:
20160606_195521.jpg


And the laundry hole filled back in. Pex was encased in sand, lots and lots of sand. Also ran a 2" pvc line in there for future under slab needs.
20160513_070607.jpg


Its taken so much longer than it seems in this post... haha
 

CRJ

Hibernating
Location
Toronto
Wow! Looks great Nate. I now see why you haven't been riding much
Thanks! Yea, fun funds have been tied up lately!
I saw the tub picture somewhere. Was it pirate?
Did you? I posted the new tub in the home fabs thread, nowhere other than facebook though.
Looks good man! The drywall behind the paneling was code for fire spread.
Ah, makes sense, but we found it in odd places like the skinning of a external closet. Regardless, it will all get replaced with 1/2" or in some areas will add the 1/2" to the 3/8" to save from having to demo the room and still bring it up to code.
 

CRJ

Hibernating
Location
Toronto
index.php

The x is being difficult with images for some reason. sorry for the sideways shot.
 

Attachments

  • Bathroom.jpg
    1.4 MB · Views: 286
Last edited:

CRJ

Hibernating
Location
Toronto
Tub is in. Only thing left is the vanity light, as we haven't found one we like yet, and the bathroom mirror I have to make after wave daze.

17760768_10209657336093578_444625412387229409_o.jpg
 

CRJ

Hibernating
Location
Toronto
Is that a fixed door stop mounted to the hinge side of the door? We've always used hinge stops but yours in intriguing.

Looks great!
Thats one half of a towel bar I cant find the cross bar for haha. I tried a hinge stop however it wont work as we have 1" thick trim. Need to come up with something though, likely door mounted near the bottom.
 
Top Bottom