Winter build 91 SN

decided to build this one for speed. cant wait to see what the top speed is. all machine work is done. just waiting on gaskets. pump is in. midshaft is in. waiting on Blowsion billet pieces and steering. all coming together nicely though. paint is primer, silver base coat, Candy Raging Red, and 2 coats of clear. Jet trim mats. chin pad and cross bar pad coming. Ported and epoxied the stock cases. Hogged out transfers on cylinder for more volume. B pipe ported to 50mm. Damn thing was 42mm.20201130_130250.jpg
 

Attachments

  • 20201130_130255.jpg
    20201130_130255.jpg
    62.8 KB · Views: 25
  • 20201130_130301.jpg
    20201130_130301.jpg
    111.5 KB · Views: 24
  • 20201130_130318.jpg
    20201130_130318.jpg
    160.6 KB · Views: 23
  • 20201130_130327.jpg
    20201130_130327.jpg
    119.2 KB · Views: 22
  • 20201130_130342.jpg
    20201130_130342.jpg
    108.2 KB · Views: 22
  • 20201130_130349.jpg
    20201130_130349.jpg
    101.7 KB · Views: 19
  • 20201130_130425.jpg
    20201130_130425.jpg
    127.9 KB · Views: 21
more pics. gotta get some of the paint. its really nice in the sun
 

Attachments

  • 20201202_175429.jpg
    20201202_175429.jpg
    158.1 KB · Views: 21
  • 20201130_154724.jpg
    20201130_154724.jpg
    135.4 KB · Views: 20
  • 20201130_154802.jpg
    20201130_154802.jpg
    154.9 KB · Views: 20
  • 20201130_154836.jpg
    20201130_154836.jpg
    148.8 KB · Views: 20
  • 20201202_163235.jpg
    20201202_163235.jpg
    116.1 KB · Views: 20
  • 20201202_175345.jpg
    20201202_175345.jpg
    152.4 KB · Views: 20
Top Bottom