lots of work going on and getting done.
the 300 is 100% glassed!!! The tray is completely glassed in, the foot holds are solid. Tray feels really comfortable. I think I will like this ski!
90% of the body work on the bottom is done and wasn't as bad as I thought it would be. Sprayed some primer last night to see where it was at, and I was pleasantly surprised. I've been using west systems 410 and epoxy resin as my filler, still sands harder than bondo but is worth the extra effort and cost. The top deck and nose should be less blending.
I was planning on having my body shop friend spray the color, but I think I am going to do that as well now to keep it cheap and on time. I know if I let the body shop spray it, it could take them 3 weeks to get it done and I want to ride this thing bad! My air blair hull a.k.a. Black Betty is being clear coated at the body shop right now, I will post pictures and feedback of that build when I get it back. Its gonna be sick!
Also got the wetjet motor and pump rebuilt & assembled, midshaft house rebuilt. Went through everything, added pro series reeds, ported the cases, port matched the cylinders, bored out to 82.5mm, rebuilt the carb, added an MSD ignition I had laying around. Glad I bought my 2 new factory B pipes back in December!!! sorry everyone, I hogged them.
Looking forward to riding with some of you east siders this summer!