For anybody that's curious on how much time actually goes into a build like this.............here are the numbers!! Can it be done quicker?.....YOU BET!......but the end result will be a direct reflection of that saved time.
550sx ski complete disassembly, strip decals, and thorough cleaning of hull.
***************16.5 hours*************
Hull crack/gouge repair, bilge reinforcements with epoxy and glass.
**************8 hours*****************
Hull sanding, tubbies, blending, finishing, prep and paint.
*****************73.75 hours**************
750 engine and pump teardown, clean, mod, fit, rebuild, reassemble.
*****************10.5 hours***********
Clean, prep, and paint ALL mechanical and small parts to reassemble.
****************32 hours*************
Final assembly or everything....putting it back together!
*******************27.25 hours*********
Installation of the mats, decals, and other final touches.
*****************8 hours***************
And finally, some extra time spent chasing your tail or finding misplaced stuff!
******************2 hours****************
And for those who are not good at math........178 hours!!!! I had a bit over 200 hours on my wife's Superjet build. I think it's safe to say that a full custom build or restoration DONE RIGHT will land in the 150-200 hour range. Armed with that info, you are ready to start your own build!!!!!