- Location
- deptford nj
Tanks almost done, top is just resting on in the pic, once the other hole is drilled for the 90 I'm putting at the top of the front of the tank, that wll be welded on and then weld the top on and its done, the 2 90s in front will have the ends cut down a little more n use clear line for sight on gas level, going to hold just shy of 4.5 gallons.