build complete 5-5-08 - check pics outs

INDebtSJ

Having a VISION!
Location
Ga
What kind of paint is that?????? Looks really good!

Interlux Brightside.
I painted my ski with it.I did the Interlux perfection first and then did the Brightside.More color choices in the Brightside.
The verdict is still out on mine till I can get into the water and see how it holds up.
You can look up boat forums and search for the paint.I had seen some sweet paint jobs on boats that was rolled and tipped.
 

bign1514

"Rock-Man"
Location
Louisville, Ky
the ski is looking awsome - laid my first coat of paint on top! i am liking the blue as of now. but i think i need a pen stripe theme to go on top. I will post pictures tom of the first coat. When i get the time.... i will also try and do a write up on how i applied the Interlux Brightside paint. So far i think its going to hold up. its a good alternative instead of spray paint, because a quart is around 25 bucks.
 

bign1514

"Rock-Man"
Location
Louisville, Ky
here are some pictures of the first coat of paint.....
 

Attachments

  • DSC01757.JPG
    DSC01757.JPG
    149.8 KB · Views: 60
  • DSC01759.JPG
    DSC01759.JPG
    158.8 KB · Views: 68
  • DSC01758.JPG
    DSC01758.JPG
    157.1 KB · Views: 46
  • DSC01760.JPG
    DSC01760.JPG
    136 KB · Views: 47
  • DSC01761.JPG
    DSC01761.JPG
    145.9 KB · Views: 31

bign1514

"Rock-Man"
Location
Louisville, Ky
the project is finally done!!!! 96 superjet completed for freestyle.

96 hull - with Tubbies
Reinforced Hull
External fuel next covered up
REV footholds
WDK Hood
WDK nose
WDK pole bracket
Blowsin pole spring
Pro-tec ride plate
Solas intake grate
Solas concord 13/16 3mm cutback
CATS trim system
- pro-tec nozzle
- bored nozzle
82mm bored engine
freestyle port
HotRods crank
ADA head with 33cc
Factory B-pipe (older style - with the bore out)
Factory Pipe manifold
Pro-tec intake manifold
Modified CDI (no rev limiter)
Dual miuki 44s
KN flame arrestors with RIVA outerwears
Dual fuel pick-up
Dual cooling
Jetworks Valve
Modified gas tank

i prob. forget some of the little stuff

project took around 3 months to complete as most of it was done in spare time and hours and hours to prepping it for paint.
 

Attachments

  • S7300264.jpg
    S7300264.jpg
    95 KB · Views: 102

bign1514

"Rock-Man"
Location
Louisville, Ky
more pics
 

Attachments

  • S7300267.jpg
    S7300267.jpg
    87.1 KB · Views: 97
  • S7300272.jpg
    S7300272.jpg
    66.6 KB · Views: 42
  • S7300270.jpg
    S7300270.jpg
    78 KB · Views: 94
  • S7300273.jpg
    S7300273.jpg
    71.2 KB · Views: 72
  • S7300268.jpg
    S7300268.jpg
    81.5 KB · Views: 44
Top Bottom