Ok so have been busy last week up at Loki customs building the ski with John.
The ski went together over 2 days and we were both impressed how easy it was and how little shimming was needed.
The pump alignment is normally one of the hardest parts but that was done with the shoe on in no time at all with no shims required.
The motor again was easy with only one shim but I do use gp800 mounts shimmed down to fit.
We decided to mount the electric box on the right hand side of the hull behind the carb for easy access on the beach if required leaving space for a twin carb motor should I get one soon
.
Sent from my iPhone using Tapatalk