Hello people!
I'm getting ready to reinforce the inside of my superjet hull. I bought some 1708 Biax (with stitched backing mat) and epoxy resin kit from Uscomposites.
Right now, my tray is removed and foam completly out. I was wondering if I should reinforce the tray area also before closing the area and reforming. (bottom and sides) ?
I am planning to reinforce the floor area, the underneath of the pole area (from inside), and the sides, but for the sides, I was wondering if I should do both halves (top and bottom) or people usually do only the bottom part?
I've seen a video of a guy filling the bond line with thickened epoxy (cabosil), then laying a single piece of glass that does the top and bottom halves, but I wanted to make sure this was the usual procedure.
Also, with 1708 biax (with 3/4 oz mat stitched), how much layers should I lay? Maybe more on the floor area and less on the sides? I really don't know
thanks a lot for the help!
I'm getting ready to reinforce the inside of my superjet hull. I bought some 1708 Biax (with stitched backing mat) and epoxy resin kit from Uscomposites.
Right now, my tray is removed and foam completly out. I was wondering if I should reinforce the tray area also before closing the area and reforming. (bottom and sides) ?
I am planning to reinforce the floor area, the underneath of the pole area (from inside), and the sides, but for the sides, I was wondering if I should do both halves (top and bottom) or people usually do only the bottom part?
I've seen a video of a guy filling the bond line with thickened epoxy (cabosil), then laying a single piece of glass that does the top and bottom halves, but I wanted to make sure this was the usual procedure.
Also, with 1708 biax (with 3/4 oz mat stitched), how much layers should I lay? Maybe more on the floor area and less on the sides? I really don't know
thanks a lot for the help!