have been working on my ski a little, the front foot hold is turfed and installed, attached the primer and bilge switch.
just mounted the mid shaft, i cant do the pump yet as i have discovered the bushes i got with thrust trim are incorrect so brian is sending me some new ones out
Pole is on and tight, just fed the start stop cable and throttle cable through and figured out how im doing the rachet, its all coming together
hopefully ill get a chance maybe tomorrow to look at the engine alignment, looked good when i dropped it in before didnt seem to need shims, vertical alignment is spot on, its a little off left/right which i may be able to pull back on the bolt holes... im guessing the dampner takes some of that up too <!-- / message --><!-- sig -->