Looking at the ski yesterday morning,l decided since l have to wait on fairing that l needed to reinforce the edges of the holds where l extended the tops.As well as going around the footholds.Using 2" and 3" carbon tape.The front of the holds where they meet the tray got extra,cause I ground it down till there was no glass left.
Also installed the new inserts that @Nate_D gave me a year ago. Thanks! Gflex to the hull,coming back with thickened epoxy over them and they get a cap when done.Cool little tricks!
Closed up a number of holes all over the top deck from having enough epoxy left over,bilge,old handle pole breather holes,and the toe loop holes.
Basically done on the deck now and ready to flip her over on the backside . The bottom I'll be filling in divots all over and then repairing the pump tunnel shoe area.l bought a new 148 mm shoe that will be installed instead of the 144mm.Should be ready for prep and paint after done there.
Just waiting on the order from us Composite's to come in so l can finish the gunwales
Also installed the new inserts that @Nate_D gave me a year ago. Thanks! Gflex to the hull,coming back with thickened epoxy over them and they get a cap when done.Cool little tricks!
Closed up a number of holes all over the top deck from having enough epoxy left over,bilge,old handle pole breather holes,and the toe loop holes.
Basically done on the deck now and ready to flip her over on the backside . The bottom I'll be filling in divots all over and then repairing the pump tunnel shoe area.l bought a new 148 mm shoe that will be installed instead of the 144mm.Should be ready for prep and paint after done there.
Just waiting on the order from us Composite's to come in so l can finish the gunwales