We have an amazing team with tons of support so we can move mountains if we need.
The subs have been amazing as well. Getting a brand new MCC designed, built and delivered in under two weeks was a tall order but Rockwell delivered 3 days early.
We replaced the entire controls system so so that group had to engineer the system from the ground up, build the PLC backplane and provide complete drawings in the short time frame as well.
The mechanical and electrical teams worked around the clock for the first two weeks with no drawings or schematics and had to get things as close or as flexible as they could and then be ready to adapt as plans finalized.
Zero first aids, no accidents or injuries and only one hard hat got thrown through the entire job.
I've worked on many fire rebuilds over the years but nothing to this extent. It's been one of the most impressive emergency projects I have ever had the privilege to work on and it only further solidifies how glad I am that I took the leap and accepted a position with this team.