Pump is painted and test fitted however some clearancing will be needed with the ride plate hitting the pump so once it's ground down, it will need another shot of paint. The cold fusion driveline tool is money well spent... makes alignment so easy. I will need to clearance some pump holes about 1/16" to get it to slide over. I pulled the tubbies last night and added a small bead of silicone around the edges and bolt holes.
Other tasks knocked off the list last night include installing new bendix, new carb speed plate for dasa intake mani, disassembled pump/midshaft for new shafts, glued down bilge cup, removed all fasteners from hull and reinstalled w/ antiseize and/or loctite, and drilled out brass water fittings.