- Location
- Jackson MI
Is it wrong that I want that jig table more than what's sitting on it?
The last company I worked for bought some very very basic jigs from the company that builds that table and they were 60k a piece. Before they sent the purchase order I had designed a jig in cad for what we needed that could have been built with scrap from our product line. I tried to save them the 180k they spent on the jigs but they wanted them. Why a fab should would buy jigs for a part we designed is beyond me but I guess that's too much of a de rail for this thread lol.