I find that doing a quality paint job seems to take a lot of time. It's been two weekends already - and I have only primer on it.
However, this second coat is A LOT better than the first. I'll wet sand to 400-500 grit on Friday and drive it back over to my buddy's house on Saturday for sealer, base coat, and intercoat clear. There's a remote chance we can get some graphics on it on Sunday.
The weekend after that will be spent on installing new flooring in our house. We got nasty old carpets, three little boys, a dog and two cats.
My local riding buddy and Home Depot employee Whitca hooked me up on some hardwood flooring.
So then I am looking at late March just to get the paint all the way done.
Turfing is another big job and so is assembly. I will also need to spend time getting this thing legal & registered.
However, this second coat is A LOT better than the first. I'll wet sand to 400-500 grit on Friday and drive it back over to my buddy's house on Saturday for sealer, base coat, and intercoat clear. There's a remote chance we can get some graphics on it on Sunday.
The weekend after that will be spent on installing new flooring in our house. We got nasty old carpets, three little boys, a dog and two cats.
My local riding buddy and Home Depot employee Whitca hooked me up on some hardwood flooring.
So then I am looking at late March just to get the paint all the way done.
Turfing is another big job and so is assembly. I will also need to spend time getting this thing legal & registered.
Last edited: