Plans for this winter:
1) New pipe.
Running my pipe works, but it is a beast and every bitof 30 pounds DRY. Would like a B-pipe, but with funds being tight, i would notmind a coffman one bit.
And with that get my dual cooling hooked up. I usually run in smaller inlandlakes where 75-80 degree water is not unusual.
2) bore jugs .020 with new wiseco pistons.
3) port the sleeves
4) reinforce under the pole bracket (fiberglass)
any pics / advice as to doing this on a square nose???
5) chop 3" off my aluminum pole.
6) if all goes good and i can get a cheap a/m waterbox, i would also like toditch the OEM.