Wire job I did for this ski.
Hey Mark do you have any pictures of the internals? I can only imagine what the inside looks like because the outsides look amazing.
Can't wait to see it finished and flipped!
Wire job I did for this ski.
It's not easy stuff to use but done right and Witt the right tools it's the best.
You want 3/8s it will do everything on a ski from 2 wires to 10.
You want 3:1 dual wall heat shrink too. Adhesive flows out when you uses it.
http://www.buyheatshrink.com/
Hey but what do I know I'm just a Kawi guy right? Lol
Installing and properly adjusting trim and then the steering takes time.
I don't but same style inside. It's a brand new MSD stamped sept 2011 so it's new new. I make it so everything is off the box even the bilge power. Then everything is quick connect so you don't need to open the box to pull the motor. Nice easy and clean.Hey Mark do you have any pictures of the internals? I can only imagine what the inside looks like because the outsides look amazing.
Can't wait to see it finished and flipped!
Yea, took me all day to get my steering and trim dialed .and yes there were adjustments/fitment issues on the thrust system also .i had to grind the cable arm to allow clearance so that when the bolt that holds it tightens, it sat flat on the pump mount.this is a milestone getting this stuff finished.looking good.Installing and properly adjusting trim and then the steering takes time.