If these were being build in an assembly line fashion, it would be quicker to install driveline into the bottom deck. Then install the top deck. But these are not gonna happen this way...... How long does it take to do a complete Pump, driveline, electonics, pole, steering, plumbing, etc etc...... You are looking at a day at least to start. If you were to get 4 guys and each have a set task. I would guess every 4 hours a ski could be completed in a 8-10 hour day. This is providing everything bolts in place. And honestly, I do not see that happening. 150 skis? I dont think RRP has done 150 skis in a 4 year period.
I have a hard time believing that there are 150 - 300 already ordered............. sorry.
Are you serious?
RRP only 150 skis in 4 years.....
If that’s the case I’ve built 10% of them....
The sport is a bit bigger world wide than most realize, a small percentage of the parts development I’ve been involved in get sold to the US.
The team behind this is also a lot bigger than most realize and the volume of skis pre ordered worldwide would surprise all of you too.
Testing? why do you think this is public knowledge?
Ive ridden it, so have a lot of others with a few clues how stuff works and I think what Krash has done is amazing.
You are a visible person on this forum and obviously passionate, but, here is a good example of not knowing what you don’t know.
Unlike the 2018 Superjet with BNG, this will be worth the wait