I decided to start addressing the dash. I needed to not only bridge the gap but also add back some much needed structure. I also needed to add a bunch of glass to the gunwales since I am making them adjustable foothold ready.
I started by cutting up some templates for a support pillar. Since there is a lot less stucture than stock I figured it needed to be beefy. The dash will tie into the pillar.
I filled the bond line with Cabosil and Glass bubbles.
Then I installed the pillar which is 6 layers and put a strip over the bond line.
I also Filled the gaps up at the top of the hull and fared the pillar in with cabosil.
I then layed 5 layers of 1708 on the gunwales.
And one layer for now on the upper engine bay.
Doing the right side tomorrow and hopefully tying the dash in on Sunday.