RiverRat
.......
- Location
- Louisville, Ky
wow! I was thinking of getting those REV footholds but I don't want to wait till 08...09
He's good at cranking those out....that is no problem
wow! I was thinking of getting those REV footholds but I don't want to wait till 08...09
you havent seen a rick roy pole yet?
ust read this on another thread, Seams WDK is not the only slow poke in the bus.
Does Jeff lie about when parts were shipping just to get a little more time for the part, or is he that clueless on what the shipping status is.
By this time, you would think he would have leaned to say 'you will get it in a month', even if he knows it will only be 2 weeks.
That's for sure.
But I don't ever read about other suppliers lying repeatedly about when it's done and shipped. :dunno:
Got nothing for ya there bro as I have not dealt with the others.
wow. this does it for me, even after rats thread i was still considering buying a good bit of stuff from WDK. Not any more, never will he get a dime from me.
He had a guy in his shop that took care of packing and shipping. However, my pole was not the only order that he had not shipped properly over the last few weeks (ie. did not have a tracking record of what was shipped where ect.) Hopefully this will all get squared away soon and when he has someone ship a item out he will be able to say that with more confidence. I have heard stories about this employee, but we will just leave it at that.
More time for him to make stuff for me then LOL
just read this on another thread, Seams WDK is not the only slow poke in the bus.
" I just assembled my hull with a blowsion jk hood, it fit perfect, The xft hull is amazing, huge in pump cavity scuppers, reinforced everywhere a superjet should be and very light (mines a 66lb, but really weighs 72). every thing is like the superjet as far as bolting things up so any hood will fit also stock pole and bracket will fit. after waiting a long time to get (almost 7 months) I would say it is worth it"
What do you think it would cost to make a pole in materials? Bob may know? $100 - $150? Could they be manufactured cost effectively to sell them for $300 - $350?
Doug
What do you think it would cost to make a pole in materials? Bob may know? $100 - $150? Could they be manufactured cost effectively to sell them for $300 - $350?
Doug