Did some work yesterday, hopefully more today - school work keeps getting in the way
Was able to file the pivot shaft bolt and fix the threads saving me $50 on a replacement. Assembled the hand pole bracket and married it to the ski.
Put in the gas vent , new filler neck , new front foam
Also drilled the bilge outlet
Ran all of the wiring , cooling & cables . Installed the bilge along with some other pieces. I also picked up a plastic 90 for the bilge outlet to give needed WB clearance
Done for now -