88kawi5fiddy
pew pew lazers!
- Location
- So Utah
thee ol 3 month build turned 15 months or so.... had many of these before
Yea,life gets in the way of a good build.She’s a lot closer to being finished now.thee ol 3 month build turned 15 months or so.... had many of these before
to match the build length?You know he looked at both then picked slow.
yesto match the build length?
It goes right here where the red square isl got this lD label with the ski.l think it goes right under the vin.Can anyone help?
Thanks @AAlamo ! l can get that stuck on there and cleared over.It goes right here where the red square is
Not really a lot that can be done.lf you were to “drop” the sj pump tunnel,it would mess up the alignment of the driveshaft.Not my idea,but you could possibly move the ride plate brass inserts a little deeper,but then what other problem are you creating?Looking good!
Good to know on the ride plate height. I have nothing to add, but I'll be sure to check that on mine before I send it off for paint.